Tuesday, April 27, 2010

Day 49 (11th April 2010)

Today we are expecting another batch of furniture...
TV Console

2-Seater Sofa

Foldable Dining Table

Boy's Room Wardrobe and Chest Drawer

Day 48 (10th April 2010)

We are expecting some furnitures to be delivered today...
Our Kitchen Layout
Washing Area

Front Load Washing Machine
Refrigerator


Boy's Room


Master Bedroom
Bed Frame

Wardrobe

Day 45 (7th April 2010)

Finally everything is done....
Handover today...

Monday, April 12, 2010

Day 40 (2nd April 2010)

As expected there will be a delay for the handover.
Almost everything are already installed but only there are some touch up and one floor tile to be changed due to crack.








Day 38 (31st March 2010)

Lightings are installed.

Light for Both Bedrooms


For Kitchen


For both toilet & store room

Altar cum Divider
It is only half way done, will continue tomorrow.....

Day 37 (30th March 2010)

Window grills are install today.

Master Bedroom


Bedroom 2
Kitchen

Common Toilet


Master Bedroom