Monday, July 12, 2010

String Curtain

At first we thought of using the beads curtain but it was quite difficult to find one.
In the end, we decided to use a string curtain instead.

Sunday, May 2, 2010

We have moved in....

Finally we have moved into our new home....
Here are photos of the before and after renovation....

Main Door & Iron Wrought


Door Steps


Living Room


Kitchen


Common Toilet


Master Bedroom


Master Bedroom Toilet


Boy's Room


Store Room

Tuesday, April 27, 2010

Day 49 (11th April 2010)

Today we are expecting another batch of furniture...
TV Console

2-Seater Sofa

Foldable Dining Table

Boy's Room Wardrobe and Chest Drawer

Day 48 (10th April 2010)

We are expecting some furnitures to be delivered today...
Our Kitchen Layout
Washing Area

Front Load Washing Machine
Refrigerator


Boy's Room


Master Bedroom
Bed Frame

Wardrobe

Day 45 (7th April 2010)

Finally everything is done....
Handover today...

Monday, April 12, 2010

Day 40 (2nd April 2010)

As expected there will be a delay for the handover.
Almost everything are already installed but only there are some touch up and one floor tile to be changed due to crack.








Day 38 (31st March 2010)

Lightings are installed.

Light for Both Bedrooms


For Kitchen


For both toilet & store room

Altar cum Divider
It is only half way done, will continue tomorrow.....

Day 37 (30th March 2010)

Window grills are install today.

Master Bedroom


Bedroom 2
Kitchen

Common Toilet


Master Bedroom

Tuesday, March 30, 2010

Day 36 (29th March 2010)

They have started to paint the base coat for our house already.
Expected to be finished on Tuesday or Wednesday... Hopefully everythings goes well...
Main & Bedrooms doors are also to be arranged to install today.

Monday, March 29, 2010

Day 33 (26th March 2010)

Common Toilet
Sink and tap are all installed...
Now only left with the window...


Master Bedroom Toilet


Kitchen cabinet




Lightings are also delivered today.


Main Switch Board


Water Heater Switch and Light Switch

Thursday, March 25, 2010

Day 31 (24 March 2010)

Acrylic bi-fold door are installed today.

Day 27 (20th March 2010)

There are a few things that are put up during this time.
Toilet bowl, shower set and table top for basin are installed in both toilets.

Water Heater
Shower Set
Table Top for Basin

Air-con are also install for living room and 2 bedrooms.
Living Room

For Bedrooms